Rescuers Push 200 Meters Into Buried Nepal Tunnel In Search For Missing Workers
Nepali Army footage shows search and rescue teams working inside the tunnel of the Upper Trishuli-1 hydropower project after the Bhote Koshi flood.
Joint teams had pushed about 200 meters into the tunnel, according to Army updates, while a Korean tunnel team worked alongside Nepali crews at the site.
The flood wrecked the project’s headworks and buried parts of the tunnel under mud and rock. Hundreds of workers at Upper Trishuli-1 were listed missing or unaccounted for after the surge.
Some people were pulled out alive during the first days. When the 38-second footage was posted on September 2, the search inside the blocked tunnels was still underway.
Clean HD download
Register a media account or sign in to buy & download this story
Sign in to download Apply for media accessClip details
Credit: Nepali Army / NTA
Byline: Darko Manevski, Journalist
Licence: Non-exclusive · Worldwide
Rating: Not rated yet
Restrictions: None
#BhoteKoshi#Flood#Hydropower#MissingWorkers#Nepal#NepaliArmy#Rasuwa#SearchAndRescue#Tunnel#UpperTrishuli1
Related
Fire & Rescue
Jayhawk Helicopter Plucks Five Crew Members From Grounded Vessel on Remote Alaskan Coast Near False Pass
Animals
Coast Guard Helicopter Hoists Five People and Their Dog From Flooding Fishing Boat Off South Carolina
Fire & Rescue
Bodycam Shows Officers Yanking Trapped Driver From Burning Jeep Under Downed Power Lines
Fire & Rescue